Greenough River Solar Farm

This project was a joint venture between Verve Energy and GE Energy to construct a 10MW solar farm some 50km south-east of Geraldton in WA. The solar farm comprises 150,000 solar photovoltaic modules covering an area of 50 hectares.

GCo Electrical laid over 40km cable during the project including the installation of: HV and LV cabling; communications cabling; AC and DC underground cabling; and associated terminations. Testing of over 128 harness combiner boxes was also performed as part of the works.

The project was completed in August 2012.

Previous Project Next Project